What it pays

Project feasibility studies at 50% cost share; project incentives of $300/MWh of verified savings ($450/MWh in grid-constrained local areas), up to 75% of eligible project costs, to a maximum of $15 million per project

Deadline: none stated on the source page

The IESO's large-scale electricity efficiency program for industrial process work; it cost-shares the feasibility study first, then pays on verified savings. Because incentives are paid against measured results, a baseline measurement and an M&V plan are required at application, before anything on the system is changed.

Who qualifies

Owners, operators or authorised third parties for non-residential facilities in Ontario's industrial, municipal, institutional and healthcare sectors, proposing a minimum electricity saving of 600 MWh per year.

Summarized from the official page. This is not advice; the provider decides.

Status note, as recorded

Launched 20 November 2025 and confirmed open by the IESO's own launch notice: "Save on Energy's XLerate Program is now open and taking applications." It replaces the previous Save on Energy Industrial Energy Efficiency Program (IEEP). The $450/MWh grid-constrained rate is stated in the IESO launch notice (ieso.ca), not on the program page; the program page states only $300/MWh, so quote the higher rate as "per the IESO's launch announcement". The program page publishes no intake window or deadline. Projects must be completed within five years of the Participant Agreement execution date, and participants must achieve at least 50% of anticipated savings to earn the incentive. The strongest fit in the whole library for measurement and verification work: "Baseline measurement is still required prior to making any changes to the system to create the M&V plan at the application stage." Program Guide for Participants v2.0 is dated 11 May 2026.

Level
Provincial
Region
Ontario
Utility
Electricity · Compressed air
Open the official program pagesaveonenergy.cahttps://saveonenergy.ca/For-Business-and-Industry/Programs-and-incentives/XLerateRead off that page on by Quantify research pass (agent) 2026-08-25 — [TOM-REVIEW] before launch (§K.3 #26)

Program details change. Always confirm with the provider before budgeting. If this page and the official page disagree, the official page is right, and we would like to know, at .

All programs

Print this, then let us go and find the number it asks for.

Nearly every application on this list wants a measured figure that most plants do not have yet. Metering produces it, and we can help your team put the paperwork together around it.

Book a site visitThe whole library

or call 1-833-QUANTFY (1-833-782-6839)