Case studies
Predictive maintenance case studies
3 of our 19 case studies are about predictive maintenance.
This is a real page with its own address, not a JavaScript filter state (§B.2). Combining two rails is a URL parameter on the library page.
What we found.
Predictive maintenanceWaterBreweries & Beverage
A failing diaphragm pump, caught before it failed
Carlsberg Canada
A failing diaphragm pump caught before it failed, and 540,000 L/day of loss prevented.
540,000 Lper day
Predictive maintenanceBulk Handling & Rail LogisticsManufacturing: automotive, plastics & rubber
Conveyor drive bearing degradation caught six weeks early
A bulk handling facility
A bearing changed its signature about six weeks before it would have seized.
6 weeksof warning
Predictive maintenanceMunicipal & Public Utilities
Pump cavitation caught three weeks early
A municipal water facility
The vibration signature changed about three weeks before anyone would have heard it.
3 weeksof warning
Run the same numbers on your own factory.
The estimator on our ROI page takes your own bills and our published benchmarks and gives you a sense of what is probably hiding in yours. It costs nothing and it asks for nothing.
Book a site visitRun the numbers
or call 1-833-QUANTFY (1-833-782-6839)
