Real-time data for your factory.

Quantify Environmental installs permanent wireless sensors across your factory and streams everything into one modern, real-time dashboard. We stay on after the install, finding the opportunities, helping your team act on them, and bringing your costs down.

Book a site visitSee the platform

Consumption · last 24 hDemo dataAlert
Grand River PowerFictional utility · illustrationELECTRICITY INVOICEGRP-2026-06-118440ISSUED 04 JUL 2026ACCOUNT4102 8837 61SERVICE PERIOD01–30 Jun 2026RATE CLASSGS > 50 kWRidgeway Plastics Inc.118 Wellington Rd · Guelph, ONMETER E-44711021,182,940 → 1,241,548 kWh58,608kWh THIS PERIOD194kW PEAK DEMAND0.94POWER FACTORELECTRICITYOn-peak energy12,940 kWh @ $0.1030$1,332.82Mid-peak energy17,290 kWh @ $0.0870$1,504.23Off-peak energy28,378 kWh @ $0.0760$2,156.73Line loss adjustment2.4 % of metered energy$119.85DELIVERYMonthly service charge30 days$178.42Distribution, demand194 kW @ $5.5622$1,079.07Transmission, network194 kW @ $4.9100$952.54Transmission, connection194 kW @ $3.8400$744.96REGULATORY CHARGESWholesale market service58,608 kWh @ $0.0043$252.01Rural or remote rate protection58,608 kWh @ $0.0013$76.19Subtotal$8,396.82HST 13 %REG. 80112 4471 RT0001$1,091.59AMOUNT DUEBY 25 JUL 2026$9,488.41CONSUMPTION HISTORY · kWh PER MONTHTIME AXISMONTHDAYMINUTEREADINGS · ONE DAY1,440BASELINELunch dipDemand 312 kW118 kW over your usual peak≈ $4,120 if this interval sets the month
LAST 24 H · 30-MIN BUCKETS · DASHED = BASELINE
Chart data
IntervalMain incomer (kW)
00:00146
00:30152
01:00157
01:30152
02:00148
02:30154
03:00158
03:30149
04:00151
04:30157
05:00146
05:30150
06:00177
06:30212
07:00246
07:30246
08:00251
08:30250
09:00251
09:30254
10:00252
10:30254
11:00242
11:30242
12:00216
12:30220
13:00259
13:30274
14:00312
14:30268
15:00219
15:30224
16:00227
16:30220
17:00216
17:30218
18:00224
18:30220
19:00218
19:30227
20:00220
20:30217
21:00218
21:30225
22:00218
22:30169
23:00174
23:30164

Trusted on factory floors across Canada.

  • Carlsberg Canada
  • PDI Bulk
  • Mitchell Plastics
  • Amalgamated Dairies Limited
  • The Regional Municipality of York
  • Region of Waterloo
  • Polycorp
  • CpK Interior Products
  • Nature Fresh Farms
  • CSL Silicones
  • Niche Bakers
  • Farm Fresh Poultry

[TOM-REVIEW] Logo permissions are confirmed client by client before launch. The band renders ONLY roster entries with a cleared asset file — clients still awaiting permission stay in src/data/logos.js and out of the render, so no empty slot can ship.

Your whole facility, one screen.

Every meter and submeter you have, water, electricity, natural gas, compressed air, temperature, vibration and level, reading minute by minute into one login. That is an Energy Management Information System, an EMIS, and it tells you the moment something drifts off its baseline rather than at the end of the month.

Dashboard views

Every view below is server-rendered and complete. Cycling through them one at a time needs JavaScript.

Main incomer · last 24 h
BASELINEShift startLunch dipDemand 312 kW≈ $4,120 if this interval sets the month
LAST 24 H · 30-MIN BUCKETS · DASHED = BASELINE
Chart data
IntervalMain incomer (kW)
00:00146
00:30152
01:00157
01:30152
02:00148
02:30154
03:00158
03:30149
04:00151
04:30157
05:00146
05:30150
06:00177
06:30212
07:00246
07:30246
08:00251
08:30250
09:00251
09:30254
10:00252
10:30254
11:00242
11:30242
12:00216
12:30220
13:00259
13:30274
14:00312
14:30268
15:00219
15:30224
16:00227
16:30220
17:00216
17:30218
18:00224
18:30220
19:00218
19:30227
20:00220
20:30217
21:00218
21:30225
22:00218
22:30169
23:00174
23:30164
Municipal water · last 12 h
OVERNIGHT FLOOR
LAST 12 H · LITRES PER MINUTE · DASHED = BASELINE
Chart data
IntervalMunicipal supply (L/min)
18:00263
18:30264
19:00268
19:30267
20:00270
20:30265
21:00268
21:30268
22:0046
22:3049
23:0041
23:3053
00:0052
00:3041
01:0044
01:3040
02:0050
02:3047
03:00510
03:30515
04:00508
04:30217
05:00215
05:30207
Header pressure · Compressor 2Watch
7.4bar010
BAR · BAND = ABOVE PROCESS NEED · TICK = LIMIT
Reading
Value7.4 bar
Scale0.0–10.0 bar
Limit8.0 bar
Temperature & humidity · factory floorAlert
PROCESS HALLPACKAGINGCOLD STOREDRY GOODSSHIPPINGUTILITY ROOMQA LABOFFICE & MEZZANINE21.4°C46% RH23.1°C51% RH22.0°C47% RH22.8°C49% RH20.6°C44% RH6.8°C82% RH18.9°C38% RH16.4°C52% RH27.6°C33% RH21.0°C45% RH22.2°C41% RH24.9°C40% RH
CURRENT READINGS AT TWELVE SENSORS · °C / % RHIn bandWatchAlert
Temperature & humidity · factory floor
SensorAreaTemperature (°C)Relative humidity (%)Status
TH-01PROCESS HALL21.446ok
TH-02PROCESS HALL23.151ok
TH-03PROCESS HALL22.047ok
TH-04PROCESS HALL22.849ok
TH-05PACKAGING20.644ok
TH-06COLD STORE6.882alert
TH-07DRY GOODS18.938ok
TH-08SHIPPING16.452ok
TH-09UTILITY ROOM27.633watch
TH-10QA LAB21.045ok
TH-11OFFICE & MEZZANINE22.241ok
TH-12OFFICE & MEZZANINE24.940ok
Silo levels · now
REORDERSilo 1 Flour: 78 %Silo 2 Sugar: 54 %Silo 3 Starch: 19 %Silo 4 Salt: 63 %78541963
PERCENT FULL · DASHED = REORDER RULE
Chart data
IntervalValue (%)
Silo 1 Flour78
Silo 2 Sugar54
Silo 3 Starch19
Silo 4 Salt63
Vibration · drive-end RMS
ALARMShift startLine down4.6 mm/s · alarm crossedTwelve hours of warning before anybody could hear it
LAST 24 H · mm/s RMS · DASHED = ALARM
Chart data
IntervalDrive-end RMS (mm/s)
00:002.05
00:302.11
01:002.04
01:302.15
02:002.09
02:302.18
03:002.12
03:302.22
04:002.16
04:302.27
05:002.21
05:302.33
06:002.62
06:302.85
07:003.01
07:303.08
08:003.16
08:303.22
09:003.31
09:303.28
10:003.44
10:303.51
11:003.62
11:303.58
12:003.40
12:303.47
13:003.78
13:303.94
14:004.16
14:304.38
15:004.63
15:304.71
16:004.88
16:305.02
17:005.19
17:305.11
18:005.04
18:304.92
19:004.80
19:304.66
20:004.51
20:304.22
21:003.65
21:303.10
22:002.74
22:302.55
23:002.43
23:302.36
Where the water actually goes
municipal to cip, 430 L/minmunicipal to pasteurizer, 300 L/minmunicipal to tower, 190 L/minwell to boiler, 190 L/minmunicipal to washdown, 150 L/minrecovered to tower, 120 L/minrecovered to cip, 90 L/minmunicipal to unaccounted, 80 L/minwell to pasteurizer, 80 L/minMunicipal supply1,150 L/minWell water270 L/minRecovered loop210 L/minCIP520 L/minPasteurizer380 L/minCooling tower makeup310 L/minBoiler feed190 L/minWashdown150 L/minUnaccounted80 L/min
24-H AVERAGE · LITRES PER MINUTE
Flow data
FromToValue (L/min)
Municipal supplyCIP430
Municipal supplyPasteurizer300
Municipal supplyCooling tower makeup190
Well waterBoiler feed190
Municipal supplyWashdown150
Recovered loopCooling tower makeup120
Recovered loopCIP90
Municipal supplyUnaccounted80
Well waterPasteurizer80

Everything feeds one dashboard.

We respect what you have already paid for. Endress and Hauser meters, a PLC with a 4-20 mA output, a legacy SCADA system, the pulse meter the utility put in years ago: we integrate them rather than rip them out. The point is one screen, not one brand of equipment.

Everything feeds one dashboard
{ }APIREST APIIoT devicesLoRaWANWireless sensors900 MHzOther systemsModbus · existing PLC tagMMeterspulseLegacy equipment4-20 mAEdge computer900 MHzLOCAL BUFFERWater
SIX SOURCES · ONE GATEWAY · ONE DASHBOARD
Integration methods
SourceMethod
APIREST API
IoT devicesLoRaWAN
Wireless sensors900 MHz
Other systemsModbus · existing PLC tag
Meterspulse
Legacy equipment4-20 mA
Everything feeds one dashboard
{ }APIREST APIIoT devicesLoRaWANWireless sensors900 MHzOther systemsModbus · existing PLC tagMMeterspulseLegacy equipment4-20 mAEdge computer900 MHzLOCAL BUFFERWater
SIX SOURCES · ONE GATEWAY · ONE DASHBOARD
Integration methods
SourceMethod
APIREST API
IoT devicesLoRaWAN
Wireless sensors900 MHz
Other systemsModbus · existing PLC tag
Meterspulse
Legacy equipment4-20 mA
  • Six kinds of source, one edge computer on your network, one dashboard.
  • Wireless sensors we install, meters and PLCs you already own, and the systems and databases you already run.
  • A 4-20 mA signal off a machine older than your network arrives in the same place as everything else.

How the data actually gets there

On your floor

One partner, from the first site walk to the last reading.

We design it, we order it, we build it, and we come and install it ourselves. The sensors are wireless and run for years on a battery, they go in without stopping your line, and the people who put them up are the people who answer when you call. White glove, start to finish.

Wireless sensor · close-up [PHOTO]

A sensor on the line. No conduit, no trenching, no shutdown to put it there.

Base station · factory behind [PHOTO]

One base station on the wall collects every sensor in the building.

The truck at the silos [PHOTO]

We show up, we climb it, we wire it. That part is not subcontracted.

Compressors, chillers, boilers [PHOTO]

The big equipment is where the money is, so it is where the meters go first.

Antennas · 900 MHz [PHOTO]

900 MHz, through steel and concrete, with batteries measured in years.

Two ways our system pays for itself.

01

Production & process visibility

Silo and material levels, vibration, product temperature, compressor and cooling-tower health. These are numbers most factories have simply never had. It is the half that is growing fastest for us, and it is where predictive maintenance starts: you fix the bearing on a Saturday instead of meeting it on a Tuesday.

02

Utility & overhead reduction

Water, electricity, natural gas and compressed air, metered permanently and priced. This is the half that pays back first, because it comes straight out of opex and lands in EBITDA the same year. And once there is a real baseline, optimization finally has something to aim at.

Nine places your factory is leaking money.

  1. 01

    Water

    A 10 LPM leak costs >$15,000 a year.

    Submeter every major consumer. We find the leak in week one; the monthly review makes sure it gets fixed.

  2. 02

    Electricity

    Demand charges are often 30–40% of the bill.

    See the peaks before the utility bills them. Shift them, shave them or schedule around them, and the dashboard shows which of the three pays.

  3. 03

    Natural Gas

    Unnoticed waste quietly inflates heating bills 10–20%.

    Baseload creep is invisible on a monthly bill. It is obvious on a 60-second trace.

  4. 04

    Compressed Air

    Leaks silently eat 20–30% of compressor output.

    The most expensive utility per unit of work, and the easiest 20% you will ever recover.

  5. 05

    Silo & Material Level

    Someone is still climbing the silo to check.

    Non-contact radar level, continuous, with low-level alerts. No climbing, no mid-run surprises, no emergency reorders.

  6. 06

    Vibration

    A bearing changes its signature weeks before it seizes.

    The shift is invisible to the human senses and unmistakable in the trend.

  7. 07

    Predictive Maintenance

    Unplanned downtime runs $10,000+/hour at most factories.

    The same repair, done on a Saturday instead of in a crisis. That difference is worth more than the part.

  8. 08

    Temperature & Humidity

    The 6 a.m. round takes 31 minutes, or 0 from your desk.

    Health, safety and humidex monitoring that’s watched continuously, not checked quarterly.

  9. 09

    Process Monitoring

    A hunch is not something you can act on. Data is.

    Cycle counts, runtime, firing rate and product temperature: the process numbers your utility bill will never show you.

What can we measure?

Close to anything in your building, and a good deal of what is outside it. This is the short version.

  • PressureLine, header and vessel pressure, continuously.
  • TemperatureProduct, ambient and asset, NIST probes where it matters.
  • HumidityRelative humidity in rooms, coolers and dry stores.
  • VibrationThree-axis, on motors, pumps, fans and gearboxes.
  • LevelSilos, tanks and totes, without the ladder.
  • FlowWater and liquid flow on the main and every sub-user.
  • pHEffluent, process water and CIP returns.
  • Total suspended solidsWhat your wastewater surcharge is actually priced on.
  • Air qualityParticulate, carbon dioxide, carbon monoxide and more.
  • Water qualityConductivity, dissolved oxygen and ORP alongside pH.
  • Energy and powerMains and sub-users, current draw, demand peaks.
  • Compressed airFlow and pressure, so leak load stops being a guess.
  • Analog signals4-20 mA, 0-10 V, pulse and dry contact.
  • Process operationsRuntime, cycles and the numbers a bill never shows.
  • Predictive maintenanceCatch the bearing on a Saturday, not on a Tuesday.
  • Asset monitoringWhere it is, whether it moved, whether it is open.

All 44 of them, searchable

Run the numbers on your factory.

Pick a size, pick a utility, and drag.

Factory size

The controls need JavaScript. The figure beside them is a worked example for a medium factory — the full estimator is the same arithmetic.

Typically addressable

$144,000/yr

30% of $480,000 a year in electricity, across about 120,000 sq ft.

Demand charges are often 30–40% of an industrial electricity bill.

Refine it on the ROI page →

An illustrative estimate from published benchmarks. Your number comes from your own meters.

Quantify's own published framing: 'Demand charges are often 30–40% of the bill.'

Funding

Your project may already be covered.

Utilities and governments pay for a lot of this work. We sit down with your team and help put the paperwork together, which is not the same as being grant writers, and it is usually the difference between doing it yourselves and handing twenty per cent of the money to a funding consultant. Here are three programmes open to Canadian manufacturers right now.

  • Utility-runOntarioCloses in 79 days · 13 Nov 2026

    Enbridge Gas: Industrial Custom Program

    Enbridge Gas (Ontario)

    AmountManufacturing: $0.30/m3 of annual gas saved for the first 50,000 m3, then $0.20/m3; capped at 75% of incremental project costs to a maximum of $250,000 per project

    Custom incentives and engineering support for industrial natural-gas efficiency retrofits (boilers, heat recovery, steam systems, process heating and similar projects) paid per cubic metre of gas saved.

    What this covers Checked

  • ProvincialOntarioNo stated deadline

    Save on Energy: Retrofit Program

    IESO (Independent Electricity System Operator), Ontario

    AmountUp to 50% of eligible project costs; Custom stream pays $1,800/kW or $0.20/kWh, whichever is higher; Prescriptive industrial EMIS pays $50,000 (facilities up to 400,000 GJ/yr) or $250,000 (above 400,000 GJ/yr); double incentive rates available in electricity-constrained regions (still capped at 50%)

    Incentives for electricity-saving upgrades at industrial and commercial facilities (HVAC/chillers, lighting and controls, variable-speed drives, manufacturing equipment and solar PV) via prescriptive (set) and custom (measured-savings) streams. The prescriptive stream also funds installation of an industrial Energy Management Information System (EMIS), i.e. the metering and monitoring layer itself.

    What this covers Checked

  • ProvincialOntarioNo stated deadline

    Ontario Made Manufacturing Investment Tax Credit (and Expanded OMMITC)

    Government of Ontario

    Amount10% base rate (up to $2M/year); enhanced 15% rate for expenditures May 15, 2025 – Dec 31, 2029 (up to $3M/year), on up to $20M of eligible expenditures per taxation year. The CCPC credit is refundable; the Expanded OMMITC for non-CCPCs is a 15% NON-refundable credit.

    A corporate income tax credit on capital investments in Ontario manufacturing, Class 53/43 machinery and equipment used in manufacturing or processing, and Class 1 buildings used for manufacturing or processing. Refundable for CCPCs; the expanded credit for non-CCPCs is non-refundable.

    What this covers Checked

See the whole funding library

TYF · Text Your Factory

Ask your factory. It answers.

Ask your factory a question in plain English and get a plain-English answer, with the chart behind it. TYF is our AI agent and it reads the same live data your dashboard does.

  • “What was the water use in my facility last week, day by day?”
  • “Is my compressor running well?”
  • “Do a water balance.”

See how TYF works

TYF · Text Your FactoryFactory 4 · replies instantly

What was the water use in my facility last week, day by day?

Water · last week
MON: 41 m³TUE: 44 m³WED: 39 m³THU: 43 m³FRI: 40 m³SAT: 22 m³SUN: 19 m³41443943402219
DAILY TOTAL · m³

Weekdays run about 40 m³. Saturday and Sunday still came in at22 and 19 m³ with the factory down. That is baseline flow, not production.

TYF is in pilot with select clients. The conversation above is illustrative.

What our clients say.

…immediate annual savings of over $150,000…
Jeff InkesGeneral Manager, PDI BulkRead the PDI case study [TOM-REVIEW] Full verbatim quote required before launch — only this fragment is on file. §K.2 #9.
…unprecedented visibility…
Derek CairneyMaintenance Reliability Specialist, Carlsberg CanadaRead the Carlsberg case study [TOM-REVIEW] Full verbatim quote required before launch — only this fragment is on file. §K.2 #10.
I’ve never seen a system this good.
A Ministry of Labour representative Said unprompted on a factory floor. Role only — never named, and not an institutional endorsement.

Start with a walk around your factory.

An hour on your floor, a look at your last few bills, and an honest read on what is worth metering first. If the numbers do not work we will tell you that too, and if they do you will have them before anyone asks you for a decision.

Book a site visitSee the platform

or call 1-833-QUANTFY (1-833-782-6839)