Municipal program
Industrial Water Rate Program (Block 2 rate)
City of Toronto (Toronto Water)
What it pays
2026 Block 2 rate $3.3219/m3 vs. general rate $4.8629/m3 (~30% reduction) on consumption over 5,000 m3/yr
Deadline: none stated on the source page
Not a grant but an ongoing ~30% discounted water/wastewater rate on industrial process water above 5,000 m3/year, in exchange for maintaining an approved water conservation plan.
Who qualifies
Toronto manufacturers in the industrial property tax class using >5,000 m3/yr, compliant with the Sewers By-law, with an approved water conservation plan and annual progress reports (due July 1).
Summarized from the official page. This is not advice; the provider decides.
Status note, as recorded
Active; the required conservation plan and annual reporting are a natural fit for metering/monitoring services.
Program details change. Always confirm with the provider before budgeting. If this page and the official page disagree, the official page is right, and we would like to know, at info@quantifyenv.com.
Print this, then let us go and find the number it asks for.
Nearly every application on this list wants a measured figure that most plants do not have yet. Metering produces it, and we can help your team put the paperwork together around it.
Book a site visitThe whole library
or call 1-833-QUANTFY (1-833-782-6839)
