What it pays

Up to 50 percent of the cost of an energy assessment; maximum incentive by annual gas consumption, 300,000–3 million m3: $6,000; 3–10 million m3: $10,000; below 300,000 m3 and above 10 million m3: individually assessed

Deadline: Deadline 2026-11-30

Cost-shares the engineering study that finds the savings (steam trap surveys, process improvement studies, air balance studies and, explicitly, metering installations) at industrial and agricultural natural gas facilities. It is the study-stage companion to the Industrial Custom Program that funds the fix.

Who qualifies

Enbridge Gas industrial and agricultural customers in the Enbridge Gas Inc. franchise area whose facility uses natural gas for key equipment and processes; assessments must be pre-approved before the work is carried out.

Summarized from the official page. This is not advice; the provider decides.

Status note, as recorded

Verified open 2026-08-25. THE REASON THIS ENTRY EXISTS: the eligible assessment types named on the page include "metering installations"; a gas utility cost-sharing the meter itself, at up to 50%. Enbridge's own manufacturing page frames the same offer as "Energy assessments and meters: up to 50 percent of eligible costs". Beware a stale 75% figure circulating in search summaries; the program page says 50 percent. Assessment projects must be "completed between Jan. 1 and Nov. 30 of the current calendar year"; the page says "current calendar year", not 2026, so this deadline ROLLS EVERY JANUARY, exactly like the Industrial Custom entry. Pre-approval is mandatory: obtain confirmation of acceptance before carrying out the assessment. Enbridge notes its "Connect with an Energy Solutions Advisor" form was experiencing technical issues at retrieval, phone contact may be needed.

Level
Utility-run
Region
Ontario
Utility
Natural gas
Open the official program pageenbridgegas.comhttps://www.enbridgegas.com/ontario/business-industrial/incentives-conservation/programs-and-incentives/audits-studies-assessments/industrial-studiesRead off that page on by Quantify research pass (agent) 2026-08-25 — [TOM-REVIEW] before launch (§K.3 #26)

Program details change. Always confirm with the provider before budgeting. If this page and the official page disagree, the official page is right, and we would like to know, at .

All programs

Print this, then let us go and find the number it asks for.

Nearly every application on this list wants a measured figure that most plants do not have yet. Metering produces it, and we can help your team put the paperwork together around it.

Book a site visitThe whole library

or call 1-833-QUANTFY (1-833-782-6839)