Case studies

Bulk Handling & Rail Logistics case studies

Level, temperature and equipment monitoring across sites where the product spends most of its life in transit or in a tank.

4 of our 19 case studies are in this sector.

All 19 case studies

A real page with its own address (§B.2), reachable from the Industries hub, the sector page and the library’s industry rail.

What we found in factories like these.

  • Compressed airWaterFood & Beverage ProcessingBulk Handling & Rail Logistics

    Over 450,000 litres saved in four months, and the clearest compressor graph we've produced

    PDI Bulk

    >450,000 litres of water saved in four months, and the clearest before/after compressor graph we've ever produced.

    >450,000 Lin 4 months

  • Predictive maintenanceBulk Handling & Rail LogisticsManufacturing: automotive, plastics & rubber

    Conveyor drive bearing degradation caught six weeks early

    A bulk handling facility

    A bearing changed its signature about six weeks before it would have seized.

    6 weeksof warning

  • Energy & electricityBulk Handling & Rail Logistics

    Night setback that never happened

    A distribution warehouse

    The overnight setback had silently stopped working, and it was worth about a third of the load.

    ~35%of overnight electrical load

  • Silo & levelPharmaceutical & ChemicalMunicipal & Public UtilitiesBulk Handling & Rail Logistics

    Tank level and inventory reconciliation

    A bulk chemical storage operation

    Measured tank level reconciled against what the paperwork said was in there.

    Continuousreconciliation

We would like to see what these numbers look like in your factory.

Bring us a shift and a stack of bills. We will walk the plant with your team, point at what is worth metering first, and put a figure beside it.

Book a site visitRun the numbers

or call 1-833-QUANTFY (1-833-782-6839)